1 / 6
Big Slab catalogue
Calacatta Luxury
Broad storm-grey veins sweep across a warm white ground, shot through with threads of rust and gold — classic calacatta drama at full slab scale. It is stocked in both finishes: Polished gives the veining a glassy depth, while Silk holds the same pattern matte and low-glare. Bold enough to Book-match into mirrored pairs, and at home on kitchen islands and countertops, luxury bathroom walls, and any feature surface meant to hold the room.
Surface
Polished/Silk
Colour
White
Model code
SS6016AP12
Size
160 x 320 CM
Thickness
12mm
Stock
Ready stock
Starting slab price
฿4,000 / m²
Slab + Installed
฿6,000 / m²
More photos
More photos of Calacatta Luxury
Additional slab, product, and application photos to help compare tone and details before asking about the real slab.






Stock
Ready stock
A Face
Ready stock
B Face
Ready stock
A Face
Ready stock
B Face
Ready stock
Project estimate
Estimate starting prices for countertops, walls, and floors
Choose the work type, area, and package to estimate from ฿4,000 / m² for slab only and ฿6,000 / m² for an installed package.
Important notes
Walls higher than 3.2 metres may have additional costs.
Floors with uneven existing surfaces may have additional costs.
Final pricing must be confirmed from drawings, real dimensions, site details, and slab moving method.
Every pattern uses the same price
You do not need to choose a pattern before calculating. If a model-specific promotion is active, the system will show product options automatically.
Area input method
Slabs
1
Billed area
5.12 m²
Estimated price
฿20,480
Bangkok and surrounding provinces — For Bangkok and surrounding provinces, send details for the team to assess the real site again.
Countertop, wall and floor share the same rate per m². Choosing a work type changes the site notes below, not the price.
This is a starting estimate. Final dimensions, cut-outs, sink, hob, edges, and corner work must be checked by the team.
The installed package includes standard fabrication and installation, excluding structure, electrical, plumbing, and removal work.




